Quadro

Project Case Study

The Quadro

A 12-floor mixed-use project in Miami where BIMWerx modeled and coordinated mechanical and plumbing systems to support cleaner routing and a more streamlined installation process.

3D Coordination Technology Audits BIM Services Mechanical BIM Plumbing BIM Mixed-Use
408K Square Feet
12 Floors
198 Residential Units
27K Retail Sq. Ft.
387 Parking Spaces
400 Hours

The Quadro

The Quadro is a mixed-use project located in Miami, Florida. The Quadro consists of approximately 408,000 square feet contained within 12 floors with 198 residential units, 27,000 square feet of retail, and a parking structure for approximately 387 parking spaces.

BIMWerx was asked to model and coordinate the mechanical and plumbing systems throughout the building and provide a cohesive model to the construction team to allow them to view the coordinated routing of the systems and streamline the installation.

Mixed-use project located in Miami, Florida
Approximately 408,000 square feet across 12 floors
198 residential units and 27,000 square feet of retail
Mechanical and plumbing systems modeled and coordinated throughout the building
Objectives

Routing Systems Through a Diverse Mixed-Use Layout

The project was rather diverse due to the unique floor levels and mixture of residential, retail, and parking. The residential units had a total of 17 different base units with 12 unit variations, essentially eliminating the ability to copy many levels and connecting risers.

Floor-to-floor heights further complicated the corridors where systems needed to crossover each other. Having done projects like this in the past, the BIMWerx team knew a few tricks for routing that allowed us to extend the utilities from the risers on each level.

Unique Floor Levels The project included varied levels and different building uses, making routing and coordination more complex.
Residential Unit Variations With 17 different base units and 12 unit variations, the team could not simply copy levels and riser connections.
Corridor Crossovers Floor-to-floor heights created challenges where multiple systems needed to crossover each other in the corridors.
Experienced Routing Strategy BIMWerx used experience from similar projects to route utilities from the risers on each level more efficiently.
Impact on the Construction Process

Coordinating In-House to Provide a Higher Level of Project Confidence

The entire process took approximately 12 weeks and close to 400 hours to complete. While BIMWerx was not the BIM Coordinator on the project, we still ran our own clash detection and coordination in-house to ensure we maximized our weekly meetings and provided a level of competence the project warranted.

Although the project was already under construction, BIMWerx provided enormous value to the team.

Project Impact

Approximately 12 weeks of BIM coordination work
Close to 400 hours completed by the BIMWerx team
Mechanical and plumbing systems modeled throughout the building
In-house clash detection and coordination completed by BIMWerx
Cohesive model provided to help streamline installation

Need BIM Support for a Complex Mixed-Use Project?

BIMWerx helps project teams coordinate mechanical and plumbing systems, improve routing visibility, and support smoother construction installation.