Constructability Reviews

BIM Services

Constructability Reviews

BIMWerx helps project teams review design models and drawings early, uncover coordination issues, and document potential field problems before they become expensive construction conflicts.

Design Model Review
Clash Detection
Written Reports
Pre-GMP Review
Constructability Reviews by BIMWerx
Early Review Before Field Problems

See How the Design Will Work Before Construction

Have you ever received the design models and drawings but are curious how it will all play out in the field? How do you know if it’s well-coordinated without internally spending hundreds of hours figuring it out? BIMWerx can help with that.

BIMWerx can take the design models as early as the 100% design development phase and start running clash detection. But it doesn’t stop there.

What BIMWerx Reviews

A Detailed Report That Shows What Needs Attention

BIMWerx produces a full written report with many images from the models and drawings, along with descriptions of everything we find. The goal is to give the project team a clear picture of shortcomings, conflicts, and potential solutions.

Model Conflicts We review design models and run clash detection to help identify conflicts before they reach the field.
Plumbing Inverts We compare plumbing invert elevations and locations with civil drawings to identify possible coordination issues.
Slopes & Insulation We check plumbing slopes, along with piping and duct insulation, to help catch issues that may affect installation.
Building-Type Experience BIMWerx has most likely worked on the building type you are working on and understands common pinch points.
Why It Matters

Better Feedback Before the Permit Set Is Issued

The final product is a well-written report ranging from twenty to fifty pages that sheds light on shortcomings BIMWerx sees, as well as potential solutions. Ideally, this report is completed twice before issuing the GMP to the owner.

The earliest review is typically at 100% design development. The other is at the contract document stage before the permit. This gives the design team feedback and enough time to remedy major issues before the permit set is issued.

Early Design Feedback Review models at 100% design development so major issues can be identified sooner.
Pre-Permit Review Review the contract documents before permit to help reduce late-stage coordination problems.
Clear Documentation Provide a written report with images, descriptions, observations, and potential solutions.
GMP Support Help the project team better understand design shortcomings before issuing the GMP to the owner.

Ready to Review the Design Before Issues Reach the Field?

Bring BIMWerx into the review process early and give your project team clearer feedback, stronger coordination insight, and a better chance to solve issues before construction starts.